INMOBILITOWN

Construction

Civil, electrical, and public works — industrial and commercial.

Specialties

Industrial epoxy flooring

CFE-approved epoxy resin and urethane systems with a mirror finish.

Anti-static ESD flooring

Heavy-traffic flooring with a grounded copper-strip grid and conductivity verification.

RF-120 fire-rated walls & facades

Fire-resistant fiber cement, mineral wool insulation, and basecoat finishes.

Steel structures

Domes, industrial buildings, and structures on isolated footings with IPR columns.

Waterproofing & drainage

Protection for slabs and roofs, plus storm drainage systems for buildings.

Electrical & public works

Civil and electrical infrastructure for the public and private sectors.

Sewer & drain services

Flow plugging, flow diversion, and air tightness testing for sewer and drainage networks.

Ongoing project · Sep 2024 — present

HBP CCC Lerdo — CFE 350 MW Power Plant

A 5th-generation combined-cycle power plant in Lerdo, Durango, built for CFE (Mexico's federal electricity utility). Finishing works, industrial epoxy flooring, and anti-static flooring with CFE-approved systems.

5,250 m²

mirror-finish epoxy flooring (56,500 sq ft)

2,147 m²

heavy-traffic anti-static ESD flooring (23,100 sq ft)

RF-120

fire-rated walls and facades

Process: epoxy flooring

  1. 1.Surface leveling and repair
  2. 2.Primer and sealer application
  3. 3.Surface verification
  4. 4.Self-leveling mortar-grade epoxy resin
  5. 5.Surface verification
  6. 6.Mirror-finish protective topcoat

Process: anti-static ESD flooring

  1. 1.Surface leveling and repair
  2. 2.Adhesive application for copper strip
  3. 3.Grounding system with copper grid
  4. 4.Anti-static adhesive and ESD tiles
  5. 5.Grooving for welding or sealant
  6. 6.Heat-fused PVC welding
  7. 7.Conductivity verification
Industrial epoxy floor with mirror finishCopper-strip grid for ESD flooring
30 by 20 meter steel school dome

Public works · Nov 2024 — Feb 2025

30×20 m school dome — INIFEED

Steel dome built for the 15 de Mayo Elementary School in Durango: isolated footing foundations, tie beams, and 12"×6.5" IPR steel columns.

Public works

Sewer & drain services

Flow plugging and blocking, air tightness testing of sewer and drainage networks, manhole testing, and leak detection — with specialized pneumatic equipment.

We work under PEMEX specifications and LAPEM-CFE approval

Have a build coming up?